Sidewalk Construction – E. Main Street Continuing
On April 15-19, 2024 (Monday-Friday) Wiregrass Construction will construct a sidewalk along the right-of-way of E. Main Street (Alma Street to Haven Drive).
The east bound right lane will be closed between 7:00 a.m. and 5:00 p.m.
Additionally, the contractor will be working within the intersection of E. Main Street and Columbia Highway.
Take extra precaution when driving through this area for your safety and the workers.